TK1623 / Feb 201023/02/10 |
A hive of activity in the shed, the backs of the panels nearest the camera are being painted with aluminium primer, whilst the fronts of the panels on the next table are being sanded in preperation for varnishing. Through the coach gangway the toilet wall is being stained, and just visible on the right hand side of the coach, the final body panel screws are being fitted.